Bringing the 1750/1800 tpd Ammonia Plant to Steady-state Operation

Bringing the 1750/1800 tpd Ammonia Plant to Steady-state Operation

Such revamping efforts may include the following engineering arrangements, but not limited to:

• Installation of natural gas steam preheater;
• Revamping of desulfurization unit;
• Addition of natural gas saturator;
• Revamping and replacement of heat-exchangers;
• Refurbishment of syngas compressor;
• Revamping and replacement of air coolers;
• Installation of additional water cooler;
• Addition of syngas dryer;
• Addition of hydrogen extraction from blowdown gases. 

Technology